Solar Panel Price in India and PM Surya Ghar Subsidy: What a Home System Costs in 2026

3 November 2026 | By: Latest Price List India

Rooftop solar has one question behind it: what will it actually cost after the subsidy? The central scheme that answers it is the PM Surya Ghar: Muft Bijli Yojana, run by the Ministry of New and Renewable Energy (MNRE). The subsidy slabs are fixed and widely confirmed: Rs 30,000 for a 1 kW system, Rs 60,000 for 2 kW, and Rs 78,000 for 3 kW or larger. The total system price is not fixed — it varies by vendor, city and roof — so this article separates the confirmed subsidy from indicative market costs, and never mixes the two.

The scheme in brief

  • Name: PM Surya Ghar: Muft Bijli Yojana
  • Launched: 15 February 2024, by the Government of India
  • Ministry: Ministry of New and Renewable Energy (MNRE)
  • Total outlay: Rs 75,021 crore
  • Target: rooftop solar on 1 crore (10 million) households
  • Aim: up to 300 units of free electricity per month for a household
  • Official portal: pmsuryaghar.gov.in
  • Currently approved till: 31 March 2027 (check the portal for any extension)
  • Progress: by 21 October 2026 the scheme had crossed 63 lakh beneficiary households, with 50,99,781 rooftop installations and more than Rs 33,642 crore released as subsidy, according to scheme data cited by Sarkari Yojana. Earlier milestones (about 40 lakh homes by May 2026, over 50 lakh by August 2026) show the pace — figures move monthly, so check the portal for the latest count.

Subsidy slabs (confirmed across multiple scheme guides)

System sizeCentral subsidy
1 kWRs 30,000
2 kWRs 60,000
3 kW or largerRs 78,000 (cap)

The slab works as Rs 30,000 per kW for the first 2 kW, plus Rs 18,000 for the third kW — which is why 3 kW reaches Rs 78,000 and no larger system gets more central subsidy. The subsidy is paid by direct benefit transfer (DBT) into the homeowner’s bank account after installation, DISCOM inspection and net-meter commissioning. It is for residential households (and group housing societies / RWAs for common-area load, at Rs 18,000 per kW up to 500 kW, per scheme guides). Modules must meet the ALMM List-I domestic content requirement (DCR — Indian cells), per MNRE notification material cited by GoSolarIndex.

Some states add their own top-up on top of the central subsidy. Those amounts vary by state and change over time, so this draft prints no state figure — check your state’s DISCOM or the national portal for the top-up that applies to you.

What a home system costs: indicative ranges (not official prices)

There is no single official “solar panel price”. A home quote bundles panels, inverter, structure, wiring, installation and net metering. The ranges below are third-party indicative market ranges (GoSolarIndex, October 2026 material), not government prices. Treat them as a budgeting guide only, and get vendor quotes for your roof.

System sizeIndicative total costCentral subsidyIndicative net cost (computed)Typical monthly generation (indicative)
1 kWRs 60,000 – Rs 70,000Rs 30,000Rs 30,000 – Rs 40,000120 – 140 units
2 kWRs 1,20,000 – Rs 1,35,000Rs 60,000Rs 60,000 – Rs 75,000240 – 280 units
3 kWRs 1,80,000 – Rs 1,95,000Rs 78,000Rs 1,02,000 – Rs 1,17,000360 – 420 units
Above 3 kWRs 2,30,000 – Rs 5,50,000 (4–10 kW)Rs 78,000 (capped)Rs 1,52,000 – Rs 4,72,000480 – 1,300 units

Net cost figures above are simple subtraction (total minus subsidy), labelled computed. Your actual quote depends on panel brand, inverter type, roof structure, shadow, wiring distance and your city. A system sized to your actual monthly units matters more than the biggest system: the scheme’s own guidance maps up to about 150 units a month to 1–2 kW, 150–300 units to 2–3 kW, and above 300 units to more than 3 kW.

How to apply (summary of the official process)

  1. Register as a consumer on the national portal, pmsuryaghar.gov.in, with your state, DISCOM and consumer number.
  2. Get DISCOM feasibility approval for your roof and sanctioned load.
  3. Choose a DISCOM-registered vendor and get the installation done.
  4. DISCOM inspects the plant and commissions the bi-directional net meter.
  5. The subsidy is transferred to your bank account after successful commissioning.

The portal does not charge an application fee, according to scheme guides. Apply only on the official portal and pay only your DISCOM-registered installer for the system. The scheme helpline is listed as 1800-180-3333 in scheme guides — confirm it on the portal before calling.

What solar does not do

Solar does not make your bill zero on its own. Generation depends on sunlight, roof direction, shadow and panel cleaning. Night-time use still comes from the grid unless you add storage (batteries are a separate cost and are not part of the standard subsidy slabs above). Net metering rules — how exported units are credited — are set by your state’s regulator and DISCOM, so they differ by state. Check your DISCOM’s net-metering terms before you size a system.

Frequently Asked Questions

How much subsidy do I get for rooftop solar? Rs 30,000 for 1 kW, Rs 60,000 for 2 kW, and Rs 78,000 for 3 kW or more (central subsidy, capped at 3 kW).

What is the price of a 3 kW solar system in India? There is no single official price. Indicative market ranges put a 3 kW home system at roughly Rs 1,80,000 – Rs 1,95,000 before subsidy, or about Rs 1,02,000 – Rs 1,17,000 after the Rs 78,000 subsidy. Get vendor quotes for your roof.

Where do I apply for PM Surya Ghar subsidy? On the official national portal, pmsuryaghar.gov.in. Registration, DISCOM approval, installation and subsidy payment all run through that portal.

Does the subsidy cover batteries? The slabs above are for the grid-connected rooftop system. Battery storage is a separate cost and is not part of the standard subsidy slabs printed here.

Till when is the scheme open? Scheme guides list approval till 31 March 2027. Check the portal for the current status before applying.

Sources

  • National Portal for Rooftop Solar (official): pmsuryaghar.gov.in
  • SolarSquare guide, “PM Surya Ghar Muft Bijli Yojana Online Apply” (subsidy slabs, 1 crore target, 31 March 2027 close, portal process) — https://www.solarsquare.in/blog/how-to-apply-for-pm-surya-ghar-muft-bijli-yojana/
  • GoSolarIndex, “PM Surya Ghar Muft Bijli Yojana 2026: Slabs, Subsidy & Portal Guide” (slabs, MNRE notification no. 318/631/2023-GCRT, ALMM DCR, indicative system costs) — https://gosolarindex.in/subsidy/pm-surya-ghar
  • Sarkari Yojana, “PM Surya Ghar: Muft Bijli Yojana” (21 October 2026 progress figures, outlay Rs 75,021 crore, launch 15 February 2024) — https://sarkariyojana.com/scheme/pm-surya-ghar-muft-bijli-yojana/
  • FinMandi, “PM Surya Ghar Muft Bijli Yojana 2026” (updated 31 October 2026; slabs, 300 units aim, helpline 1800-180-3333) — https://www.finmandi.com/pm-surya-ghar-muft-bijli-yojana-2026.html